May 2020 / Today / Interaction Design / Design System
Components snapshots from the final design system
The challenge
Result
Context
This case study focuses on the final part of the Australia Fire Danger Rating System project with a foundation of 9 weeks of discovering, creating concepts and shaping strategies.
I was solely responsible for creating and delivering the final design system.
Feedback
"I have never worked with designs that are so thought-through from a development perspective. Having the entire scope and grid laid out in front of me, I can stop over-engineering when I am developing. I am blown away by the level of details and am really happy about the design system."
— Front end developer from Geoplex
Scroll down to explore
Pages in the final design system
The simple truth is that with a upfront design approach and a short time frame, our team at Today was never going to design or foresee every single screen, interaction or state. Therefore, our goal is to: